How long does it take to complete the UFH Installation?
Most home installations can be achieved in as little as just one day. This is depending on the floor construction and the size of area we are installing the system into.
At what depths are the grooves cut into the floor?
The JK® floorgrinder cuts approximately 16 [mm] into the floor construction. The 14 [mm] JK® flextube pipe is installed directly in to the cut channels thereafter. The ultimate aim is to have the heating pipes flush, or just under the floor surface.